Menu
Корзина

Anchor for fixing thermal insulation with a plastic nail LI-P

  Anchor for fixing thermal insulation with a plastic  nail  LI-P
  Anchor for fixing thermal insulation with a plastic  nail  LI-P
  Anchor for fixing thermal insulation with a plastic  nail  LI-P
  Anchor for fixing thermal insulation with a plastic  nail  LI-P
Anchor for fixing thermal insulation with a plastic nail LI-P
  • Trademark: EasyFix
  • Country of origin: Ukraine
Цена: 0.00 грн.
  • Meets the requirements of DSTU B V.2.6-36: 2008 and ETAG014
  • The shape of the expansion zone has been optimized for better installation in building materials
  • The perforated surface of the disc facilitates plaster work and guarantees high quality adhesion to the plaster.

Code

Diameter (drilling) nailed-in plastic anchor, mm

Nailed-in plastic anchor length, mm

Pressure disk diameter, mm

Thrust length, mm

Minimum installation depth, mm

Maximum thermal insulation thickness, mm

Minimum drilling depth for through installation, mm

Quantity per package, pcs.

LI-P 10 80

10

80

52

50

50

30

90

100

LI-P 10 90

10

90

52

50

50

40

100

100

LI-P 10 100

10

100

52

50

50

50

110

100

LI-P 10 110

10

110

52

50

50

60

120

100

LI-P 10 120

10

120

52

50

50

70

130

100

LI-P 10 140

10

140

52

50

50

90

150

100

LI-P 10 160

10

160

52

50

50

110

170

100

LI-P 10 180

10

180

52

50

50

130

190

50

LI-P 10 200

10

200

52

50

50

150

210

50

Recommended for plaster facades.

For fixing such heat-insulating materials:

  • Styrofoam
  • Penopolistirol

Foundation materials



Characteristics
Length of spacing zone, mm50
Nail materialplastic
For fixing foamyes
For plaster facadeyes

  • Type of installation - push-through installation
  • For installation in aerated concrete, foam concrete, shell rock and ceramic hollow block, it is recommended to use only drilling without impact
  • Recommended mounting parameters:
  • minimum base thickness - 100 mm
  • minimum center distance between dowels - 100 mm
  • minimum distance from the edge of the base to the dowel - 100 mm
  • Installation instructions:
  • 1. Drill a hole
  • 2-3. Hammer to the stop, hitting the body of the dowel with a hammer
  • 4-5. Hammer the spacer (nail) flush with the dowel