Anchor for fixing thermal insulation with a metal nail LEH/TN
- Trademark: Starfix
- Country of origin: Poland
Цена: 0.00 грн.
- ITB technical assessment
- Meets the requirements of DSTU B V.2.6-35: 2008 and ETAG014
- Specially shaped thrust zone for fast installation in solid materials
Code | Diameter (drilling) nailed-in plastic anchor, mm | Nailed-in plastic anchor length, mm | Pressure disk diameter, mm | Thrust length, mm | Minimum installation depth, mm | Maximum thermal insulation thickness, mm | Minimum drilling depth for through installation, mm | Quantity per package, pcs. |
LEH 10 160 TN | 10 | 160 | 60 | 50 | 50 | 110 | 170 | 200 |
LEH 10 180 TN | 10 | 180 | 60 | 50 | 50 | 130 | 190 | 200 |
LEH 10 200 TN | 10 | 200 | 60 | 50 | 50 | 150 | 210 | 150 |
LEH 10 220 TN | 10 | 220 | 60 | 50 | 50 | 170 | 230 | 150 |
LEH 10 240 TN | 10 | 240 | 60 | 50 | 50 | 190 | 250 | 100 |
LEH 10 260 TN | 10 | 260 | 60 | 50 | 50 | 210 | 270 | 100 |
Estimated pull-out load:
from concrete - 0.75 kN
from solid red brick - 0.75 kN
from solid silicate brick - 0.75 kN
from aerated concrete - 0.60 kN
Recommended for facades with ventilated air space.
For fixing such heat-insulating materials:
- Mineral wool
- Glass wool
Foundation materials
Characteristics | |
Length of spacing zone, mm | 50 |
Nail material | steel |
For fixing mineral wool | yes |
For fixing foam | yes |
For ventilated facade | yes |
- Type of installation - push-through installation
- For installation in aerated concrete, foam concrete, shell rock and ceramic hollow block, it is recommended to use only drilling without impact
- Recommended mounting parameters:
- minimum base thickness - 100 mm
- minimum center distance between dowels - 100 mm
- minimum distance from the edge of the base to the dowel - 100 mm
- Installation instructions:
- 1. Drill a hole
- 2-3. Hammer to the stop, hitting the body of the dowel with a hammer
- 4-5. Hammer the spacer (nail) flush with the dowel